<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Noel&#039;s Green (make that SUSTAINABLE) Blog &#187; BIM</title>
	<atom:link href="http://www.noelsusskind.com/blog/archives/tag/bim/feed" rel="self" type="application/rss+xml" />
	<link>http://www.noelsusskind.com/blog</link>
	<description>ideas of a crusty green engineer</description>
	<lastBuildDate>Thu, 22 Jul 2010 17:16:10 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.0</generator>
		<item>
		<title>Modularity and HVAC systems design</title>
		<link>http://www.noelsusskind.com/blog/archives/850</link>
		<comments>http://www.noelsusskind.com/blog/archives/850#comments</comments>
		<pubDate>Thu, 11 Feb 2010 03:53:59 +0000</pubDate>
		<dc:creator>noel</dc:creator>
				<category><![CDATA[Building Performance]]></category>
		<category><![CDATA[Green Design]]></category>
		<category><![CDATA[BIM]]></category>
		<category><![CDATA[Building Automation Systems (BAS)]]></category>

		<guid isPermaLink="false">http://www.noelsusskind.com/blog/?p=850</guid>
		<description><![CDATA[<p>Simple is as simple does.   It works.  Its easier to understand.  Easier to fix.    The real world does not reward complexity.    </p>
<p>
An important aspect of good design is simplicity.   HVAC can be complicated enough, given the need to maintain various spaces at set temperatures, [...]]]></description>
			<content:encoded><![CDATA[<p>Simple is as simple does.   It works.  Its easier to understand.  Easier to fix.    The real world does not reward complexity.    </p>
<p>
An important aspect of good design is simplicity.   HVAC can be complicated enough, given the need to maintain various spaces at set temperatures, relative humidity and cleanliness.   HVAC systems are also expected to maintain certain pressurization and [code required] outside air exchange.  All while keeping to the highest possible energy efficiency.  We also need and expect them to respond precisely and correctly to changing variables.  </p>
<p>
Simplicity in controls are also key to this.  The simplest controls are on-off.   Simplicity is not  obvious everywhere.   But in reality, as software development theory teaches, you can find the simple by decomposing the complicated.   </p>
<p>Consider these concepts before the initial Basis of Design is established.   Decompose the various functions needed and decide how the system will be controlled.   Many designers have their personal preferences and presumptions,  but these must be put aside in favor of open-mindedness in the beginning of the decision making process.    Yes, energy and size calculations may be useful, but not  as important as what and how to control the various environmental parameters.  </p>
<p>Diagrams of the systems, <a href="http://www.noelsusskind.com/blog/wp-content/uploads/2010/02/airhandler_Rounded.jpg"><img src="http://www.noelsusskind.com/blog/wp-content/uploads/2010/02/airhandler_Rounded-300x128.jpg" alt="AirHandler PID" title="AirhandlerPID" width="300" height="128" class="alignright size-medium wp-image-1110" /></a><span id="more-850"></span></p>
<p><P>Mass-flows, temperatures, and  pressures.   For lighting, its watts and lumens per square foot.  And using natural ambient light wherever available. </p>
<p> Get these right the first time, and you will save all kinds of hassle.   During design,  keep the diagrams as a guide and reference.  It will keep also you focused and directed. </p>
<p> <strong>Next subject: Dedicated outside air systems (DOAS) </strong> These kinds of systems separate the ventilation "function" from the building internal HVAC.  Tens of millions of buildings have no way to split this from the basic heating and cooling.  Which makes the controls complicated.  DOAS is especially good for high occupancy rooms and in situations where air change requirements are more exacting.   Its an economic question and we have to decide how and whether this is worth the trouble.  Most significant  in schools, assembly rooms, theaters,  health care,    </p>
<p>
In many existing buildings,  DOAS, which require separate main ducts,  may be impossible to retrofit due to space limitations and structural issues.  But DOAS divides the work that HVAC systems do, they can be used to recover energy that is lost by exhaust systems.     Furthermore,  because DOAS central units can be physically remote, so they do not contribute noise to the occupied space and finally, they incorporate the potential to increase net rentable space!</p>
<p>An alternative, if the above is not economically feasible, is to keep and/or update the existing systems, measure carbon dioxide levels (a proxy for stale air), and control the entering outside air according to that parameter.     This is "Demand Controlled Ventilation" control, which I described in this<a href="http://www.noelsusskind.com/blog/archives/763"> previous post </a>in November. </p>
<p><!-- AddThis Button BEGIN --><br />
<a class="addthis_button" href="http://www.addthis.com/bookmark.php?v=250&amp;username=xa-4b7720f74d6d853c"><img src="http://s7.addthis.com/static/btn/v2/lg-share-en.gif" width="125" height="16" alt="Bookmark and Share" style="border:0"/></a><script type="text/javascript" src="http://s7.addthis.com/js/250/addthis_widget.js#username=xa-4b7720f74d6d853c"></script><br />
<!-- AddThis Button END --></p>
]]></content:encoded>
			<wfw:commentRss>http://www.noelsusskind.com/blog/archives/850/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>BIM is a database &#8211; Naming is important</title>
		<link>http://www.noelsusskind.com/blog/archives/887</link>
		<comments>http://www.noelsusskind.com/blog/archives/887#comments</comments>
		<pubDate>Sun, 24 Jan 2010 18:06:42 +0000</pubDate>
		<dc:creator>noel</dc:creator>
				<category><![CDATA[Green Design]]></category>
		<category><![CDATA[Software and the Data]]></category>
		<category><![CDATA[BIM]]></category>
		<category><![CDATA[Software]]></category>

		<guid isPermaLink="false">http://www.noelsusskind.com/blog/?p=887</guid>
		<description><![CDATA[<p>Delayed commentary on things learned and shared at a recent  RevitDC meeting:</p>
<p>NAMING THINGS and SHARING  (it’s a matter of  INTEGRITY)
Naming comes up again. “Inconsistent” is the keyword.  I am glad that I am not the only one who struggles with it.  Shakespeare wrote “What&#8217;s in a name? That which we call [...]]]></description>
			<content:encoded><![CDATA[<p>Delayed commentary on things learned and shared at a recent  RevitDC meeting:</p>
<p><strong>NAMING THINGS and SHARING  (it’s a matter of  INTEGRITY)</strong><br />
Naming comes up again. “Inconsistent” is the keyword.  I am glad that I am not the only one who struggles with it.  Shakespeare wrote “What&#8217;s in a name? That which we call a rose by any other name would smell as sweet&#8230;”    ….NOT IN computing and a BIM (building information model) it  WON’T! </p>
<p>Naming standards:  a concept that could save billions of dollars!<br />
More often than not, architects have provided drawings with non-standard names for the layers and “blocks” (which are nothing more than buckets). And these often contain attributes with yet more non-standard names.  Trouble in data-city.   [IMO, Autocad's over-reliance on the two “object-types” they call blocks and layers has created a stunting effect.  Many former CAD users will need to unlearn them to use Revit.]     </p>
<p>Make no mistake about it:  CAD is a form of database, (albeit a limited dataset).  But for a database to work decently, the rules must be created, followed, and applied consistently.   (Ref: Database design manuals and texts)   That said, think about the naming and organization that happens in the contract documents, never mind CAD.  An <a href="http://www.noelsusskind.com/BIMREPORT/BIMandAEC4.html"> article on BIM </a>that I wrote for fellow engineers, but all stakeholders should read.</p>
<p>
<strong>Should we require database design courses for BUILDING ARCHITECTS?  </strong><br />
The building designers (architects) take notice:  a change to a layer name can (and has) wreaked havoc on many things.  All the way back to my spreadsheets!   For example: countless times, even predating CAD,  I have been surprised by changes made by an architect on the room names and numbers, and being forced to MANUALLY repair these on the mechanical, electrical and plumbing documents. Not to mention the many calculations that depend on these.  Things like lighting and HVAC calculations.   (This issue will hopefully die down in a few years, although I had expected this issue to be solved by now)</p>
<p>Blocks and layers are useful for rough collections of data, but they have always been “rough”. Even after 20 years of the technology.   This is one reason why Autodesk bought out Revit. They knew that Autocad could not  compare to Revit in the evolution of Building information Modeling.  </p>
<p>Data organization apparently is not a favorite topic among architects and engineers.  It is more interesting to IT pros and a few more forward-looking architects engineers like myself.  But this is no less relevant to the building information model (design and contract documents). </p>
<p> So it happens that subject-matter experts and cross-trained folks, like myself, are breaking through the walls (pun intended) that separate the disciplines.  Witness the XML schemas being developed by groups like ASHRAE (who are guiding <a href="http://www.gbxml.org">gbXML</a>) and the Associated General Contractors of America (directing <a href="http://www.agcxml.org/">agcXML</a>). These standards will make the BIMs easier to use.</p>
<p><strong><br />
DISTRIBUTED DESIGN </strong><br />
Over the years, we have come to share our drawings by the use of the so-called  “external reference”.   Autocad called them “X-reference” plans;   a way of sharing CAD  ‘drawings’  between workstations.  Many drawings may use or even “depend” on an X-referenced  plan.  The beauty of it: make a change in one place, and it will propagate to all the dependent views.   </p>
<p>The increased popularity of BIM and BIM software demonstrates that a high priority is being given to real-time sharing.  An understanding of the true benefit has FINALLY trickled up to many decision-making managers.  No more silos of information! The lighting designer, HVAC designer and the architect can collaborate on the glass and shading all the time, not just at the weekly meeting!!! YAY!!! The cost consultants can do their cost analysis on an ongoing basis, not after the design is 80% complete and when the changes are most costly and disruptive. </p>
<p>What happens as the building design is developed  &#8211;  At RevitDC, I learned that Revit doesn’t  implement automatic notification to other team members/users of changes.   Someone said, “You don’t know what you don’t know”. YIKES!   Something is not right about that.   </p>
<p> Copy/monitor issues were mentioned.  The use of the word “copy” is a confusing terminology that resembles the CAD problems of updating.  Are we not talking about a central database? </p>
<p>I also heard about sluggishness.  Why is bandwidth still being discussed ?   Paying for a fast Internet connection is cheaper than the mistakes a slow connection can cause.  At the Revit DC meeting they discuss only Autodesk Revit. So it appears that it has an ongoing problem with its communication architecture.  Come on !!!</p>
<p>The distributed computing model came late to Revit, I think.  Graphisoft’s Archicad and Bentley&#8217;s Building don’t seem to have this problem.  Revit was not originally designed for distributed computing using large databases.  It was intended for a smaller audience in the beginning.   They had a communication issue at some point and it looks and feels like it has some sort of workaround ever since.   Maybe Revit is showing signs of stress and strains and may be replaced? </p>
<p>Archicad seems to have the distributed data and updating part smoothed out.  (Did they take a cue from Oracle?)  I have heard that Archicad updates the distributed data almost seamlessly. Compare that to Revit, which seems to stop and start.  Perhaps it goes back to the project data organization?  Technical skill of the managers?   Or is the Revit data scheme just plain bottlenecked?  </p>
<p><strong>CONNECTIONS </strong><br />
Kimon Onuma (of Onuma Software) mentioned the importance of “connections” at the RevitDC presentation.  Connections are key indeed, and when I first heard this idea many years ago, I realized that <strong>good design creates good connections between objects</strong>, and having the objects themselves is only half the task.  Learning this, like designing, is a practiced, intuitive, hands-on experience.  </p>
<p>Connecting people and ideas is a cool thing.  </p>
]]></content:encoded>
			<wfw:commentRss>http://www.noelsusskind.com/blog/archives/887/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>BIM Adoption &#8211; There is a reason it is spreading fast</title>
		<link>http://www.noelsusskind.com/blog/archives/824</link>
		<comments>http://www.noelsusskind.com/blog/archives/824#comments</comments>
		<pubDate>Tue, 12 Jan 2010 14:37:31 +0000</pubDate>
		<dc:creator>noel</dc:creator>
				<category><![CDATA[Business of A/E/C]]></category>
		<category><![CDATA[Software and the Data]]></category>
		<category><![CDATA[BIM]]></category>

		<guid isPermaLink="false">http://www.noelsusskind.com/blog/?p=824</guid>
		<description><![CDATA[<p>Money
Factoid heard at the recent Eco-Build conference in D.C.:  &#8220;The number of contractors adopting Building Information Modeling has quadrupled in the past year. &#8221;  Coming from a very small core of early and aggressive users to a large cross section.  </p>
<p>Another trend is that BIM is being used on larger projects by the [...]]]></description>
			<content:encoded><![CDATA[<p><strong>Money</strong><br />
Factoid heard at the recent Eco-Build conference in D.C.:  &#8220;The number of contractors adopting Building Information Modeling has quadrupled in the past year. &#8221;  Coming from a very small core of early and aggressive users to a large cross section.  </p>
<p>Another trend is that BIM is being used on larger projects by the larger contractors first.  Now we see it  propagating to smaller projects.   </p>
<p>Contractors gain all kinds of benefits from using BIM instead of scattered data silos (the old way.)  Having information accessible and organized in one location is a distinct step up from drawings, specs and piles of 8-1/2&#8243; x 11&#8243; submissions from vendors.    Oh yeah, and BIM makes for a better recordkeeping and more accountability.  (HIGHER QUALITY)  </p>
<p>The introduction of IT to the construction field was stunted by CAD.  BIM IS THE REAL DEAL.<br />
 Its very telling that building information modeling as conceived is based on the actual physical schema, a 3D building.  We had to wait for computer processing speed to catch up to make it viable as a design, build and operating tool.   Now we have the ability to truly document the building.  Thank you.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.noelsusskind.com/blog/archives/824/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Designers becoming Expert Users</title>
		<link>http://www.noelsusskind.com/blog/archives/789</link>
		<comments>http://www.noelsusskind.com/blog/archives/789#comments</comments>
		<pubDate>Wed, 06 Jan 2010 18:55:07 +0000</pubDate>
		<dc:creator>noel</dc:creator>
				<category><![CDATA[Software and the Data]]></category>
		<category><![CDATA[BIM]]></category>
		<category><![CDATA[Green Design]]></category>
		<category><![CDATA[Software]]></category>
		<category><![CDATA[Thinking]]></category>

		<guid isPermaLink="false">http://www.noelsusskind.com/blog/?p=789</guid>
		<description><![CDATA[<p>An important point,  when planning a project,  is that the skillsets of the users may be the real driver of success.  Software skills by the senior experts helps too.   Understanding the database may be as important as understanding the data.    Its a bit of a hurdle that most [...]]]></description>
			<content:encoded><![CDATA[<p>An important point,  when planning a project,  is that the skillsets of the users may be the real driver of success.  Software skills by the senior experts helps too.   Understanding the database may be as important as understanding the data.    Its a bit of a hurdle that most senior professionals will have as much of a learning curve as anyone.   Its not CAD anymore.</p>
<p>At a recent RevitDC meeting, Kimon Onuma (Onuma Software) said,<br />
“Its collaboration by experts, not so much the software.”   </p>
<p>Now if we can build the skillsets of the best users to match the tools and databases, we can really rock the world.   </p>
<p>I have been convinced for years:  &#8220;How the Data is collected, processed stored and retrieved will change this game.&#8221;   BIM is light years from CAD.  CAD is not about data, its just a drawing.  Going forward, I can see CAD as an inconvenient precursor to the building information model.</p>
<p>Thinker/architect Randy Deutsch has this entry on his blog about Building Information Modeling and its application, called <a href="http://bimandintegratedesign.wordpress.com/"> BIM challenge of the new Decade</a>  Its a good summary of where the information technology of building is in January  2010.    </p>
]]></content:encoded>
			<wfw:commentRss>http://www.noelsusskind.com/blog/archives/789/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>BIM forces a break with status quo</title>
		<link>http://www.noelsusskind.com/blog/archives/685</link>
		<comments>http://www.noelsusskind.com/blog/archives/685#comments</comments>
		<pubDate>Mon, 14 Sep 2009 20:16:40 +0000</pubDate>
		<dc:creator>noel</dc:creator>
				<category><![CDATA[Business of A/E/C]]></category>
		<category><![CDATA[Green Design]]></category>
		<category><![CDATA[Software and the Data]]></category>
		<category><![CDATA[BIM]]></category>
		<category><![CDATA[HVAC]]></category>
		<category><![CDATA[Software]]></category>

		<guid isPermaLink="false">http://www.noelsusskind.com/blog/?p=685</guid>
		<description><![CDATA[<p>Change is in the wind.   Software and information technology forces a break with the past.</p>
<p>For generations, we engineers depended on drawings.   The desktop PC, and software, such as Autocad,  changed our dependence into a 2-d CAD.   </p>
<p>Stephen Roth wrote in the recent issue of Consulting Specifying Engineers magazine.</p>
<p>
HVAC cooling [...]]]></description>
			<content:encoded><![CDATA[<p>Change is in the wind.   Software and information technology forces a break with the past.</p>
<p>For generations, we engineers depended on drawings.   The desktop PC, and software, such as Autocad,  changed our dependence into a 2-d CAD.   </p>
<p>Stephen Roth wrote in the recent issue of Consulting Specifying Engineers magazine.</p>
<blockquote><p>
HVAC cooling and heating load analysis for buildings currently is performed by using widely available software tools. For the past 25 years, this method has become the status quo for HVAC design engineers, and it has proven to be an effective way to accurately calculate building cooling and heating losses&#8230;.
</p></blockquote>
<p>His point is that the status quo is entrenched.  </p>
<blockquote><p>
The energy crisis in the 1970s was a wake-up call for HVAC engineers to more accurately calculate the cooling and heating loads for a building. The 1980s saw the advent of software that could be used by both small and large engineering firms to accurately calculate the building cooling and heating loads. This was a big change in the way HVAC engineers performed their building analysis, and it provided more accurate results than previous methods.
</p></blockquote>
<p>I came into this business as this software came onto the scene.  And I have been doing energy modeling with spreadsheets ever since they became available in 1981 or so.</p>
<blockquote>
<p>HVAC analysis software is quite complex, and its use often requires a solid engineering background and extensive training. This leaves architects at the mercy of HVAC engineers when doing this type of analysis at early stages of design</p>
</blockquote>
<p>I feel I should apologize to all those architects who I have intimidated over the years.
<p>Later in the article Roth says:</p>
<blockquote><p> There are some disadvantages to using 3-D BIM versus tabular input methods for load calculation purposes including:</p>
<p>      Learning to use 3-D modeling tools requires in-depth training and a new way of thinking about mechanical design. Many engineers simply may be too entrenched in their ways to accept such a shift in thinking. In addition, the cost of the software licenses and training may be prohibitive for many engineering firms. Complex 3-D modeling software often requires at least a week of formalized training and many months of on-the-job learning&#8230;</p>
</blockquote>
<p>read the entire <a href="http://www.csemag.com/article/talkback/327277-Calculate_HVAC_loads_with_BIM.php">article </a>here</p>
<p>I agree completely.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.noelsusskind.com/blog/archives/685/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Owners: Demand more Energy Modeling for the bottom line</title>
		<link>http://www.noelsusskind.com/blog/archives/617</link>
		<comments>http://www.noelsusskind.com/blog/archives/617#comments</comments>
		<pubDate>Tue, 08 Sep 2009 23:39:35 +0000</pubDate>
		<dc:creator>noel</dc:creator>
				<category><![CDATA[Green Design]]></category>
		<category><![CDATA[Software and the Data]]></category>
		<category><![CDATA[BIM]]></category>
		<category><![CDATA[Energy]]></category>
		<category><![CDATA[HVAC Operations]]></category>
		<category><![CDATA[RE investment]]></category>
		<category><![CDATA[Software]]></category>

		<guid isPermaLink="false">http://www.noelsusskind.com/blog/?p=617</guid>
		<description><![CDATA[<p>Concerns brought up by Howard McKew of Engineered Systems magazine in the July 2009 issue.   He said &#8220;Owners, Please Demand More from your IPD team&#8221; (Integrated Project Delivery ) McKew cites the fact that the new  IPD approach being promoted by the AIA is possibly a lawyers dream to make money in this [...]]]></description>
			<content:encoded><![CDATA[<p>Concerns brought up by Howard McKew of Engineered Systems magazine in the July 2009 issue.   He said <a href="http://www.esmagazine.com/Articles/Column/BNP_GUID_9-5-2006_A_10000000000000619385" target = "_blank" >&#8220;Owners, Please Demand More from your IPD team&#8221;</a> (Integrated Project Delivery ) McKew cites the fact that the new  IPD approach being promoted by the AIA is possibly a lawyers dream to make money in this economic downturn.  But then he gets to the point I would like to emphasize.</p>
<blockquote><p>“If we aren’t careful, the IPD process will be just another project delivery method where, in this case if things go well, the owner will have paid a premium in incentives to the designer and the builder for doing their jobs.  What about the long-term benefits of the building systems meeting their operating budget?  What about the facility group who should have been a partner in the process, rather than business as usual when it comes to turning over the job to the building operators?</p></blockquote>
<p>
He then goes on to list items that will make this process completely sustainable </p>
<blockquote ><p>
    *   Establish an operating budget in the initial phase of the job as part of the OPR (owner’s project requirements) for utility costs and O&#038;M costs;<br />
    * System training for the building operators early in the IPD process;<br />
    * Use of other “smart software” (programs with multiple applications) during the design and construction and continued use of these programs by the owner’s personnel in the years following the project completion;<br />
    * The implementation of building system monitoring, measuring, and benchmarking process in the performance phase (formally the warranty phase);<br />
    * The seamless integration of automatic controls system design with building system commissioning (HVAC, electric, plumbing, security, etc.);<br />
    * The integration of third-party TAB with the designer, similar to the designer and trade contractors working together with BIM.
</p></blockquote>
<p> In my opinion, this list is fairly sufficient!<br />
<div class="wp-caption alignright" style="width: 546px"><img alt="Revit Family Library" src="http://www.noelsusskind.com/BIMREPORT/image007.jpg" title="Revit Family Library Screen" width="536" height="420" /><p class="wp-caption-text">Revit Family Library Screen</p></div></p>
<p>Let’s not pay lip service to sustainable and green building practices anymore.   Why not do energy modeling on the design concept from the  very beginning!   We have the software (Revit, et al) now.  Let’s use all of its capabilities!!    Lets bring it into play in the early stages.
<p>Owners should demand better results in the major operating costs:  lighting and HVAC Energy usage.    Achieve major improvements over the code baseline (ASHRAE 90.1, et al).
<p>
For so long,  architects and builders have only thought about energy at 25% or 35% design.  Owners, ask the AEC (architects/enginmeers/construction) team to look at the whole picture. (LEED GOLD?  The highest Energy Star rating? )<br />
A long standing design and construction rule is, “The earlier a change is made to design, the less expensive to incorporate it in the final product.”   The incremental return on investment will be high, maybe infinite, in fact because the incremental cost of paying the designers to implement this upfront is very low.  And the savings fall right to the bottom line! </p>
<p>
Building information modeling and energy modeling do more than save initial building costs.  In theory,  BIM permits the architects engineers, contractors and construction managers  to put ALL of the data into the &#8220;model&#8221; as they go.   Read my report on <a href="http://www.noelsusskind.com/BIMREPORT ">BIM</a> for more information.</p>
<p>We have the tools and the training, all we need is the will to do it.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.noelsusskind.com/blog/archives/617/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Inspiring possibilities</title>
		<link>http://www.noelsusskind.com/blog/archives/248</link>
		<comments>http://www.noelsusskind.com/blog/archives/248#comments</comments>
		<pubDate>Thu, 30 Apr 2009 15:54:44 +0000</pubDate>
		<dc:creator>noel</dc:creator>
				<category><![CDATA[Business of A/E/C]]></category>
		<category><![CDATA[Green Design]]></category>
		<category><![CDATA[Software and the Data]]></category>
		<category><![CDATA[BIM]]></category>

		<guid isPermaLink="false">http://www.noelsusskind.com/blog/?p=248</guid>
		<description><![CDATA[<p>The April issue of Building Design and Construction magazine has a pretty interesting article entitled,
<p>BIM + IPD: Three Success Stories, by Jeff Yoders.  He writes on some recent projects done using the Integrated Project Delivery approach that uses the Building Information Modeling&#8211; leveraging the synched database model inside
Autodesk&#8216;s REVIT and REVIT MEP software&#8211;</p>
<p class="wp-caption-text">BIM rendering [...]]]></description>
			<content:encoded><![CDATA[<p>The April issue of <a href="http://www.bdcnetwork.com">Building Design and <a class='wikinvest-suggestion-link' articletype='industry' articletitle='Q29uc3RydWN0aW9u_0' target='_blank' href='http://www.wikinvest.com/industry/Construction' >Construction</a></a> magazine has a pretty interesting article entitled,
<p><a href="http://www.bdcnetwork.com/article/CA6650149.html?nid=2073">BIM + IPD: Three Success Stories</a>, by Jeff Yoders.  He writes on some recent projects done using the <strong>Integrated Project Delivery </strong>approach that uses the Building Information Modeling&#8211; leveraging the synched database model inside<br />
<a class='wikinvest-suggestion-link' articletype='company' articletitle='QXV0b2Rlc2s,_0' target='_blank' href='http://www.wikinvest.com/stock/Autodesk_(ADSK)' ticker='NASDAQ%3AADSK'>Autodesk</a>&#8216;s REVIT and REVIT MEP software&#8211;</p>
<div class="wp-caption alignnone" style="width: 463px"><img alt="BIM rendering of live performance hall" src="http://a330.g.akamai.net/7/330/2540/20090409161042/www.bdcnetwork.com/articles/images/BDC/20090401/bdc0904BIMempac8.jpg" title="BIM rendering of live performance hall" width="453" height="378" /><p class="wp-caption-text">BIM rendering of live performance hall</p></div><br />
<br />
This work looks great but these are not just pretty renderings.  These are only a &#8220;view&#8221; of <strong>a complete design in a database</strong>.</p>
<p><div class="wp-caption alignnone" style="width: 463px"><a href="http://a330.g.akamai.net/7/330/2540/20090409161104/www.bdcnetwork.com/articles/images/BDC/20090401/bdc0904BIMmaxcover1.jpg"><img alt="another bim rendering of live performance hall" src="http://a330.g.akamai.net/7/330/2540/20090409161104/www.bdcnetwork.com/articles/images/BDC/20090401/bdc0904BIMmaxcover1.jpg" title="another bim rendering of live performance hall" width="453" height="302" /></a><p class="wp-caption-text">another bim rendering of live performance hall</p></div><br />
<br /><span id="more-248"></span><br />
The industry has really started to take off on this tool.  Even the MEP engineers on getting on board.  This is an example of a project in the state of the art, designed and built from a database in a software such as Revit.     </p>
<p><div class="wp-caption alignnone" style="width: 463px"><img alt="Clash detection " src="http://a330.g.akamai.net/7/330/2540/20090409161104/www.bdcnetwork.com/articles/images/BDC/20090401/bdc0904BIMsutter6.jpg" title="a rendering of trades clash detection " width="453" height="165" /><p class="wp-caption-text">Clash detection </p></div>
<p><strong>Now we need to pay for insulating all those uninsulated wall cavities in our nations housing stock that were built before 1980.  </strong>  Residential buildings still account for a large percentage of our energy consumption.  We still need to go back and improve tens of millions of buildings that were built before 1980.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.noelsusskind.com/blog/archives/248/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>for BIM{{wiki}} some Benefits of BIM to the Plumbing Designer</title>
		<link>http://www.noelsusskind.com/blog/archives/222</link>
		<comments>http://www.noelsusskind.com/blog/archives/222#comments</comments>
		<pubDate>Tue, 14 Apr 2009 19:57:21 +0000</pubDate>
		<dc:creator>noel</dc:creator>
				<category><![CDATA[Business of A/E/C]]></category>
		<category><![CDATA[Green Design]]></category>
		<category><![CDATA[Software and the Data]]></category>
		<category><![CDATA[BIM]]></category>

		<guid isPermaLink="false">http://www.noelsusskind.com/blog/?p=222</guid>
		<description><![CDATA[<p>I design HVAC most of the time, but for the  plumbing designer entry in BIM {{wiki}}, I would like to offer these  </p>
<p>Advantages of BIM for the plumbing engineer :  </p>

Fixture schedules can be synchronized or linked to the architects schedule with a mere key stroke.
<p></p>
Fixture schedules ,  plans,  riser diagrams, [...]]]></description>
			<content:encoded><![CDATA[<p>I design HVAC most of the time, but for the  plumbing designer entry in BIM {{wiki}}, I would like to offer these  </p>
<p><strong>Advantages of BIM for the plumbing engineer :  </strong></p>
<ul>
<li>Fixture schedules can be synchronized or linked to the architects schedule with a mere key stroke.</li>
<p></p>
<li>Fixture schedules ,  plans,  riser diagrams, sections and details can be automatically synchronized</li>
<p></p>
<li>Visualize fixture layout and piping in 3D throughout the design process.  </li>
<p></p>
<li> Collisions and interferences can be determined immediately and automatically by software and integrated designs.   NO MORE RFIs to process, THE BIM contains the information they need.  </li>
<p></p>
<li>Riser diagrams can be developed once and then automatically synchronized with the plans.  All engineering data, (such as drainage fixture units)  can be automatically and continuously followed in plan and analyzed in a variety of views and filters.</li>
<p></p>
<li>Revisions to the plan can be done in much less time compared to CAD or drafting methods. </li>
<p></br></p>
<li>Add, delete, and modify fixtures and outlets easily with automatic update to the engineering data and the model.   </li>
</ul>
<p>Lots of time saved all around
<p>
Use of a BIM in this form: a shared database, will be a giant leap forward for everyone concerned.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.noelsusskind.com/blog/archives/222/feed</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>For you BIM and CAD jocks out there: Naming IS Important</title>
		<link>http://www.noelsusskind.com/blog/archives/204</link>
		<comments>http://www.noelsusskind.com/blog/archives/204#comments</comments>
		<pubDate>Tue, 07 Apr 2009 16:17:43 +0000</pubDate>
		<dc:creator>noel</dc:creator>
				<category><![CDATA[News]]></category>
		<category><![CDATA[Software and the Data]]></category>
		<category><![CDATA[BIM]]></category>

		<guid isPermaLink="false">http://www.noelsusskind.com/blog/?p=204</guid>
		<description><![CDATA[<p>“What is in a name? That which we call a rose
by any other word would smell as sweet.”
Shakespeare, Romeo and Juliet</p>
<p>Its not so easy to say overlook this anymore.  In an information rich business environment, names are  powerful.  Naming is important because it enables easy retrieval, as well as recognition by us humans. [...]]]></description>
			<content:encoded><![CDATA[<p>“What is in a name? That which we call a rose<br />
by any other word would smell as sweet.”<br />
Shakespeare, <em>Romeo and Juliet</em></p>
<p>Its not so easy to say overlook this anymore.  In an information rich business environment, names are  powerful.  Naming is important because it enables easy retrieval, as well as recognition by us humans.  In an information system like a building information model, it becomes critical.  </p>
<p>Engineers and architects may be used to thinking about their projects a certain way, maybe in geometric or visual imagery.   However, when it comes to documenting the design of a building or machine, we always label things to make them easy to retrieve.   </p>
<p><strong>Giving things names is a natural for humans.  The human mind seems to register memories fairly well when a name is applied to them.   Researchers into human culture and behavior have noticed and are deeply curious about the nature of naming and linguistics   I think there IS something to this idea that names are powerful carriers of meaning and subtextual meaning</strong>. </p>
<p>In design work, whether it is (was) a detail library or a project file,  it is <strong>labelling , or indexing that enables us to keep track of many items</strong>.  This has not changed .  </p>
<p>But the healthy respect for naming is in order. </p>
<p><strong>Without a tag that positions information within a collection, you may not ever find it again. Especially in larger and larger  collections, like a building database.</strong></p>
<p>Names carry meaning.  Meaning helps understanding and remembering: The human element in the memory and retrieval of important facts.  Proper naming can make the design work flow move faster, speeds communication and increases understanding among the design team members.  Proper naming can also be extended to the construction and commissioning phases.  </p>
<p>Ideally, the use of a good <a class='wikinvest-suggestion-link' articletype='company' articletitle='QklN_0' target='_blank' href='http://www.wikinvest.com/stock/BIOMERIEUX_(BIM-FR)' ticker='EPA%3ABIM'>BIM</a> name system would enable its re-use throughout the project life-cycle,  into construction, occupancy, and operations.    Understanding the importance of the naming scheme across the life-cycle of the BIM should pay dividends in to the downstream professions and trades.    Re-using a naming scheme in the BIM downstream will simplify and reduce the processing of shop submittals, not to mention materials ordering, staging, field checking, and so on, that apply to each piece of the building.   Having a quality BIM, with sound naming scheme, would very well be a dream come true for the many contractors that must collaborate on any given building project.  </p>
<p>BIM is NOT to be confused in anyway with BIOMERIEUX,<br />
BIM  the French company, nor with the blue chip company,<br />
<a class='wikinvest-suggestion-link' articletype='company' articletitle='SUJN_0' target='_blank' href='http://www.wikinvest.com/stock/International_Business_Machines_(IBM)' ticker='NYSE%3AIBM'>IBM</a>  <img src='http://www.noelsusskind.com/blog/wp-includes/images/smilies/icon_biggrin.gif' alt=':D' class='wp-smiley' /> </p>
]]></content:encoded>
			<wfw:commentRss>http://www.noelsusskind.com/blog/archives/204/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Someday this will come true &#8211; sooner than you may think!</title>
		<link>http://www.noelsusskind.com/blog/archives/189</link>
		<comments>http://www.noelsusskind.com/blog/archives/189#comments</comments>
		<pubDate>Mon, 16 Mar 2009 20:00:25 +0000</pubDate>
		<dc:creator>noel</dc:creator>
				<category><![CDATA[Green Design]]></category>
		<category><![CDATA[Software and the Data]]></category>
		<category><![CDATA[BIM]]></category>
		<category><![CDATA[Energy]]></category>
		<category><![CDATA[Software]]></category>

		<guid isPermaLink="false">http://www.noelsusskind.com/blog/?p=189</guid>
		<description><![CDATA[<p>“In a perfect world, energy simulations and design tools would be so well integrated that each time an architect moved a wall, added a window, or changed a lighting specification; the building’s predicted energy performance would be updated and displayed instantly.  With that sort of real-time feedback, designers would quickly become skilled at optimizing the [...]]]></description>
			<content:encoded><![CDATA[<p>“In a perfect world, energy simulations and design tools would be so well integrated that each time an architect moved a wall, added a window, or changed a lighting specification; the building’s predicted energy performance would be updated and displayed instantly.  With that sort of real-time feedback, designers would quickly become skilled at optimizing the energy performance of their designs, and new buildings would be rapidly approaching carbon neutrality….  “  </p>
<p>Excerpt from <a href = "http://talk.blogflux.com/topic/building-information-modeling-bim/" by ‘Ram Ashish” >a blog by Ram Ashish</a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.noelsusskind.com/blog/archives/189/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
